Paint Brush Hills Metropolitan District

━ THE DETAILS

The Challenge

The project involved the construction of a new storage facility to house equipment for the District. The building was a Pre-Engineered Metal Building (PEMB), requiring careful coordination of fabrication, delivery, and on-site assembly. Key challenges included ensuring proper integration of the PEMB system with site conditions, maintaining construction sequencing for efficient erection, and meeting project requirements for durability, functionality, and long-term equipment storage needs.

The Solution

The project team successfully delivered the storage facility through coordinated planning and execution of the Pre-Engineered Metal Building (PEMB) system. Close collaboration with the manufacturer ensured all components were accurately fabricated, delivered on schedule, and assembled in the correct sequence. Site preparation and foundation work were completed to exact specifications to support proper structural alignment and efficient erection. The PEMB system was then installed with careful attention to fit, finish, and code compliance, resulting in a durable, functional facility that met the district’s storage and operational requirements.
DOLLARS
0 K
MONTHS
0
AMAZING RESULT
0

━ THE RESULTS

The Results Were Amazing

Improved Energy Efficiency

94%

Cut Job Cost

65%

Build Speed

37%

Increased Living Ares

60%

We were very impressed with how well this project went. We absolutely recommend this company to others!